FORM C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
Bridges.
Minor Bridge.
Description Quantity Unit Rate Amount Excavation in Foundations 7,300 cu. ft. 10/- per % oft 73.00 Timbering and pumping 500.00 Concrete in foundations 700 8/- 5,600.00 Masonry in Superstructure 8,300 Masonry in Arches 980 35/- 1,295.00 Masonry in Coping 130 40/- 2,120.00 Dry Stone backing 1,960 2/- 260.00 1,900.00 Total 6,227.00 Contingencies 10% 622.70 Grand Total 6,849.70Work: One 5 ft. Arch at oh,80*300
Drawing C.R.E. No.26882.
(
Q
end
.gewlift etne noolwort
WGITOar
Helinя
TAMI723
--
ZOITAA
2.
FORM C.R.E. No. 24.
WOONITE
bcoll nist
boull dub
Main Head.
Sub. Head
SJEK
Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
103
Bridges.
Minor Bridge
10.
34.
Work One 5 ft. Arch at oh,80*300
Drawing C.R.X. No.26882.
AMOUNT.
DESCRIPTION.
Rate.
Unit.
Cts.
J
Quantity.
7,300 Excavation in Foundations.
10/- % oft
73
It
Timbering and pumping
500
*
A
700 Concrete in foundations.
8,300 Masonry in Superstructure.
980 Masonry in Arches.
130, Masonry in Coping
35/-
1,295
40/- % 2,120
2/- 0. It
1,960 00
2/-
*
260
1,900 Dry Stone backing.
10/- %
19
8 8 8 8 8 8 8
00
00
00
00
Mi 5/813500 dyeran
09
00
ISOT
Total
6,227
00
01 oʻsaigniino?
Intof bread
Contingincies 10% -
622
70
:
Grand Total
6,849
70
No comments yet.